Operations
October 14, 2026 · 2 min read
Every mine and crusher buys diesel by the tanker and uses it by the litre. Here is how to know which machine used what, and catch the gap the same day.
Diesel is one of the largest running costs in a mine or crusher, and one of the least controlled. It is bought by the tanker, stored in a tank, and issued by the bowser to excavators, dumpers, loaders and generators across a site that never really stops.
Ask how much diesel the third excavator used last week, against the hours it worked, and most sites cannot answer. Where that answer is missing, diesel goes missing too.
Issues are written in a book at the bowser, often at night, often in a hurry. Machine hours are written somewhere else, if at all. The two are never put side by side, so a machine that used more diesel than its hours justify looks exactly like one that did not.
The same gap appears between the weighbridge, the transit pass and the invoice. Each load should carry all three. When they are on separate papers, a load can leave without being billed, or be billed without its royalty being right.
On a well-controlled site, every litre issued is written against a machine, every machine logs its running hours each shift, and someone compares the two every day. Every load at the gate has its slip, its pass and its invoice together.
Give every machine a number painted large enough to read. At the bowser, write the machine number with every issue. At the end of each shift, write each machine's hours. Divide one by the other once a week. The machines that stand out will be obvious.
Your managers still act on what they see. The AI makes sure they see it while the diesel is still in the tank.
Start with diesel per machine on your busiest site. We have set out how this works for mines and crushers, from pit to invoice.
Related articles
Most construction projects do not lose money on site. They lose it in late bills, unreconciled material and progress nobody can compare with the plan.
Read more →In a cement plant, a small rise in power per tonne is invisible on any one day and expensive over a month. Here is how to catch it the day it starts.
Read more →Supply-and-install jobs look profitable on the quote. Few are checked against their actual cost at the end. Here is how to know every job's real margin.
Read more →How we see it
We set it up so the numbers are in front of you every day. The decisions stay with you.
One system for your whole business, set up around how you already work.